Cut MEP installation time by up to 60%
with no unnecessary late-payment interest
Stainless steel press and grooved system of fittings and pipes 15-323 mm
It is not only the price of materials that matters, but the speed of installation of MEP (building services) systems
and the overall impact on the schedule.

Every day of construction costs money
Faster pipe installation = earlier start of follow-up trades = schedule met = no unnecessary interest charges.
- Installation speed: Press-fitting is up to 60% faster than welding. On large projects this means saving entire weeks. (according to the case study)
- Project value: AISI 316L is the premium standard. Lifetime 50+ years. Corrosion resistance. Increases property attractiveness and value.
- Risk elimination: No fire risk. Double detection of unpressed joints including LEAK-DETECT system. Minimum complaints.
- Lower labour cost: A regular installer can press-fit after 2 hours of training. No welders needed. Multiple workers can press simultaneously.
- Complete range: Solutions from main runs to end connections (15-323 mm). One supplier for everything.
- Guarantees: Liability insurance CZK 50M, fast dispatch from stock in the Czech Republic, 5-year warranty (8 years when the system is installed by an installer trained in the TAVINOX online training).
Certifications
Areas of Application

How press-fitting saved 4M CZK and completed MEP 3 months early
Case studyHow TAVINOX saved the schedule
Heating installation, four-storey office building
- Initial situation: The installation company started work by welding seamless black steel pipe. One floor took five workers 12 days.
- Delay risk: The interim deadline was at risk and the part-finished pipework was blocking follow-on trades from starting. The schedule began to slip.
- Decision: After the 1st floor, which was welded, the company switched to the TAVINOX press system and completed the remaining 3 floors with it.
- Result: With pressing, one floor took 5 working days. The same team, the same scope – 58% shorter installation. The site met its schedule. No penalties, no additional costs from delay.
What the project would have looked like if, from the very start, it had been:
48 days of work
The deadline would have been missed
20 days of work
Schedule under control

View of the completed complex
Project result
5 days per floor instead of 12 days
Thanks to the TAVINOX system, the MEP pipework was finished 21 days earlier
MEP faster
5 days by pressing instead of 12 days by welding. Fewer welders, more installers. The same team – more joints.
Schedule under control
Drinking water – DVGW, WRAS, PAVUS, ITC, ISO. EPD – LEED, BREEAM, SBToolCZ
EPD and green financing
Typically better terms of financing. On many projects it can be a condition for obtaining a loan.
No unnecessary interest
Every month of delay = deferred income + extra interest. A delay can cost hundreds of thousands, even millions, of CZK extra.
Faster start
Ready-made BIM models, certificates and documentation. A design office saves days or even weeks.
Minimum of failures and complaints
No welding and no fire risk = lower insurance. Double detection of unpressed joints, 50-year service life, 5-year warranty, 8 years with an installer trained in the TAVINOX online training.

















