How to save CZK 4 million and finish the project 3 months early?
A real project from abroad: an industrial site with 28 storage tanks faced a critical decision. Choosing the right installation method decided whether the project made a profit.
58 %
Faster
37 %
Cheaper
14
Weeks saved
4.4M
CZK saved
How the project unfolded
1. The dilemma
The technical director is weighing up traditional welding against modern pressing. The time pressure is intense.
2. The test
A parallel test starts on several tanks. One team welds, the other presses with the TAVINOX system.
3. The result
After 10 days the pressing team is 3 tanks ahead. The client immediately switches the rest of the project to pressing.
24 weeks on site
High labour costs
10 weeks on site
Speed and savings

A view of part of the completed site
Cost savings of 37%
Welding ended up 15% more expensive than planned because of the labour involved, while pressing brought the cost of the works down by 10% thanks to the speed of installation.
| Item | Welding | Pressing | Difference |
|---|---|---|---|
| Estimated cost per tank | ~446,400 CZK | ~360,000 CZK | −86,400 CZK |
| Actual cost per tank | ~515,088 CZK | ~323,460 CZK | −191,628 CZK |
| 23 tanks in total | ~11,847,024 CZK | ~7,439,580 CZK | −4,407,444 CZK |
* The figures come from an internal audit of the project after completion in 2023.
Project outcome
10 weeks instead of 24
Thanks to the TAVINOX system, the project was handed over to the client 14 weeks early